13 2 5 main drain test.
Nfpa 25 main drain test. If you have a backflow device you need to have a test performed on at least one of your systems on a quarterly basis. Slowly open the main drain fully and allow. Closing the main control valve and opening the main drain allows the system to be completely drained for maintenance or repair purposes and nfpa 25 requires the main drain and the piping that leads to it to be tested on an annual or quarterly basis. According to nfpa 25 every fire sprinkler system has to have at least an annual inspection of its main drain to be sure it is clear.
Damaged or missing valve ie broken handle nfpa 25 code 13 2 5 low incoming water pressure systems without fire pump compare current flow pressure to previous performed main drain results if pressure has reduced 10 or more main drain is found deficient nfpa 25 code 13 2 5 2 systems with. From the 2017 edition of nfpa 25. 13 2 5 main drain test. A main drain test is required annually or any time the water supply control valve is closed this includes any time a system undergoes maintenance or repair.
Nfpa 25 13 2 3 proper drainage for main drain recommend drain be piped properly. Main drain damaged or missing valve i e broken handle. From the 2017 edition of nfpa 25. Nfpa 25 13 2 4 2 main drain test record the static water supply pressure in psi as indicated gauge.
Protection systems published by the national fire protection association nfpa requires that the main drain of an automatic sprinkler system should be tested at least annually and more often for special conditions as noted in table 13 1 1 2 of nfpa 25. Nfpa 25 code 13 3 2 2 5 main drain test. A main drain test is used to identify major reductions in water flow for the system under. A main drain test shall be conducted annually for each water supply lead in to a building water based fire protection system to determine whether there has been a change in the condition of the water supply.
The test essentially measures the water pressure in the system. Additionally at least every three years a full flow trip test should be performed. Test procedure nfpa 25 standard for the inspection testing and maintenance of water based fire protection systems published by the national fire protection association nfpa requires that a partial flow trip test of a dry pipe system be conducted annually.